PW Plumbing & Gas logo PW Plumbing & GasPaul Wright · Mansfield Call or text Paul07714 437027 Free quote
Bathrooms · Mansfield

Bathroom renovations in Mansfield

Full bathrooms, en-suites and walk-in showers, project-managed from strip-out to finish. Most are done in 5 to 7 working days.

Gas Safe registered9.86/10 from 308 Checkatrade reviewsFree written quotes

Full bathroom and en-suite renovations

PW project-manages full bathroom and en-suite renovations across Mansfield, from stripping out the old suite to the final seal. You deal with one team, not a string of trades. Most bathrooms are finished in 5 to 7 working days.

  • Complete bathroom and en-suite renovations
  • Replacing a bath with a walk-in shower
  • Shower baths, screens and electric or mixer showers
  • Waterproof wall panels as an alternative to tiles
  • New toilets, basins and vanity units
  • Heated towel rails
  • All the pipework moved or renewed while the room is stripped

Bath to walk-in shower

One of our most requested jobs. Taking out an old bath and fitting a large walk-in shower makes a small bathroom easier to use and easier to clean. We'll check the floor, drainage and water pressure at the survey so the shower works properly.

Detailed quotes, no surprises

You get a written quote that lists the work and the items, so you know exactly what you're paying for before we start.

Recent project · Mansfield

From dated roll-top to clean and bright

Same room, same window. Stripped back to the boards, pipework rerun, then a curved shower bath, marble-effect wall panels, a heated towel rail and new flooring.

Bathroom before renovation with roll-top bath, pedestal basin and brown tiles
Stage 1BeforeRoll-top bath, tired tiles
Bathroom stripped back to floorboards with new copper pipework in place
Stage 2Stripped backNew pipework run
Finished bathroom with close-coupled toilet, chrome towel rail and grey flooring
Stage 3FinishedPanels, rail, flooring
Bathroom before renovation Renovated bathroom with curved shower bath, glass screen and marble-effect wall panels BeforeAfter
Reviews

Bathroom customers say

10/10

New Bathroom

“Paul came out and removed our outdated bathroom and installed a full new walk in shower with wall panels, sink and toilet.”

Checkatrade customer · NG20 · General plumbing
Checkatrade, November 2026
10/10

New large shower installed to replace a bath

“Absolutely excellent workmanship, professionalism, advice and 2 lovely friendly guys!”

Di B. · NG23 · Plumber
Checkatrade, August 2026
10/10

Bathroom renovation

“They worked tirelessly to create a bathroom that we can use for years to come.”

Matthew L. · NG19 · Bathroom & kitchen plumbing
Checkatrade, March 2026
How it works

From first call to finished job

  1. Free survey

    Paul measures up, talks through what you want and checks pipework and drainage.

  2. Detailed quote

    A written quote listing the work and the items.

  3. Strip out and first fix

    The old suite comes out and the pipework is moved or renewed.

  4. Fit and finish

    Panels, suite, shower and flooring fitted, sealed and tested.

FAQs

Bathroom questions

How long does a bathroom renovation take?

Most bathrooms are finished in 5 to 7 working days. Larger rooms or layout changes can take longer, and we'll tell you at the survey.

Can you replace my bath with a walk-in shower?

Yes. It's one of our most popular jobs. We check the floor, drainage and water pressure first.

Do you fit wall panels instead of tiles?

Yes. Waterproof wall panels are quick to fit, easy to clean and have no grout lines.

Do you project-manage the whole job?

Yes. You have one point of contact from strip-out to finish.

Do you do en-suites?

Yes. We do full en-suite renovations as well as main bathrooms.

Get a free quote from Paul

Mansfield and surrounding areas. Call, text or send the form.

Call Paul Free quote